$35.00
Show off your Walkway pride with the iconic Walkway bridge logo in a new rainbow colorway.
| Size | Small, Medium, Large, X-Large, XX-Large |
|---|
|
Walkway’s waterfront elevator at Upper Landing Park is currently open and operating from 9 a.m. until 90 minutes prior to the bridge closing.
|